The Iron Bridge crosses the River Severn in Shropshire, England. It was the first arch bridge in the world to be made of cast iron, a material which was previously too expensive to use for large structures. However, a new blast furnace nearby lowered the cost and encouraged local engineers and architects to solve a long-standing problem of a crossing over the river. This is the first iron bridge in the world, designed by Thomas Pritchard in 1775 and built by Abraham Darby III in 1777-79.
In 1934 it was designated a Scheduled Ancient Monument and closed to vehicular traffic. Tolls for pedestrians were collected until 1950, when ownership of the bridge was transferred to Shropshire County Council. It now belongs to Telford and Wrekin Borough Council. The bridge, the adjacent settlement of Ironbridge and the Ironbridge Gorge form the UNESCO Ironbridge Gorge World Heritage Site. The bridge is a Grade I listed building, and a waypoint on the South Telford Heritage Trail.
In the early eighteenth century, the only way to cross the Severn Gorge was by ferry. However, the industries that were growing in the area of Coalbrookdale and Broseley needed a more reliable crossing.
In 1773, Thomas Farnolls Pritchard wrote to a local ironmaster, John Wilkinson of Broseley, to suggest building a bridge out of cast iron. By 1775, Pritchard had finalised the plans, but he died in December 1777, only a month after work had begun.
Abraham Darby III, who was the grandson of the first foundry owner and an ironmaster working at Coalbrookdale in the gorge, was commissioned to cast and build the bridge. The iron for the new bridge was cast at his foundry.
Shares were issued to raise the £3,200 required, and Darby agreed to fund any excess. Although it had been predicted that 300 tons of iron would be needed (costing £7 a ton), in the end 379 tons were used, costing Darby and his company nearly £3,000. There would be many other costs to bear (masonry abutments, assembly, etc.), so that the project was far more expensive than first envisaged. Darby bore most of the cost overrun, and was in debt for the rest of his life.
Being the first of its sort, the construction had no precedent; the method chosen to create the structure was therefore based on carpentry. Each member of the frame was cast separately, and fastenings followed those used in woodworking, such as the mortise and tenon and blind dovetail joints, adapted as necessary to the different properties of cast iron. Bolts were used to fasten the half-ribs together at the crown of the arch. Very large parts were needed to create a structure to span 100 feet rising to 60 feet above the river. The largest parts were the half-ribs, each about 70 ft long and weighing 5.25 tons. The bridge comprises more than 800 castings of 12 basic types. The bridge was raised in the summer of 1779, and it was opened on New Year's Day 1781.